Description: NextEra Energy Southwest Mesa Wind Project Dedication Ceremony Boot FPL Energy Florida Power & Light Dimensions: 5.5" to boot tip x 8" Ht City: Crockett, Upton Commissioning: 107 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) Hub height: Total nominal power: 80,250 kW Operational Onshore wind farm Developer: Cielo Wind Power Operator: NextEra Energy Resources Buy with confidence: I guarantee my merchandise to be as represented. Thanks Holly
Price: 35 USD
Location: Palm City, Florida
End Time: 2024-08-29T18:57:29.000Z
Shipping Cost: 9.95 USD
Product Images
Item Specifics
All returns accepted: ReturnsNotAccepted
Model: NextEra Energy Southwest Mesa Wind Project Dedication Ceremony
Brand: Neg Micon
MPN: N/A