Jardan

USB Cable SANSA Sandisk CLIP SYNC & CHARGING CORD PC data wire connect long lead

Description: 100% Brand New. USA shipment FREE and FAST!32" length (approximate) for easy attachment to any device with a USB 5-Pin Mini Port High-speed, error-free data transfer Designed to connect the USB port to USB devices with Mini 5-Pin connectors i.e. MP3 Players, Camcorders, Cameras, Cellular Phones, PDA's, GPS Units, Etc. Meets all the UL requirements for communication cabling Shielding reduces EMI/RFI interference Compatible with USB 2.0, 1.1, 1.0 OEM Equivalent Quality Replacement Appearance and length may vary slightly depending on current supplyThis is the replacement cable only. Software (if required and you don't already have it), can be freely downloaded from the manufacturers website. Most don't need special software and your computer will recognize the device automatically.These fully-rated universal serial bus cables provide transfer rates up to 480Mbps depending on USB version, and easily attach to any 5-Pin mini-USB device. Mini USB cables are designed to connect from your USB port on Hub, PC or Mac (laptop, notebook or desktop computer) to your USB device, including MP3 players, cameras, cellular phones, and PDAs. Foil and braid shielding reduces EMI/RFI interference and twisted-pair construction helps reduce cross talk thus ensuring high-speed, error-free data transfer. Compatible with USB 2.0, 1.1, and 1.0Please examine the photo in the listing carefully, and compare it to your device.If you are not sure this is the correct cable for your application please contact me before purchasing. Thanks very much.ITEMS WILL BE SHIPPED within 24 hours of cleared payment (excluding weekends) and often will ship the same day. Shipment is by USPS First Class Mail unless Priority Mail is offered in the listing. You will receive an email confirmation from USPS when the shipping label is generated.PRODUCTS ARE GUARANTEED to be as described and will be promptly replaced if defective. Please contact me if you have any problems at all. Warranty issues for a few items must be handled by the original manufacturer. If this applies it will be noted above in the description.RETURNS are accepted within 7 days, but the shipping/handling charge is not refundable except in the case of an error in the listing. Items with "Free Shipping" are subject to a restocking fee except in the case of an error in the listing.

Price: 8.72 USD

Location: Ocean City, Maryland

End Time: 2024-12-18T05:03:33.000Z

Shipping Cost: 0 USD

Product Images

USB Cable SANSA Sandisk CLIP SYNC & CHARGING CORD PC data wire connect long lead

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money back or replacement (buyer's choice)

Type: USB Cable

MPN: Does Not Apply

Brand: Unbranded/Generic

Compatible Product: Sansa Clip+

Recommended

Skull Human Head 360 degree Fully Hand Carved Bone Cow Pendant Necklace
Skull Human Head 360 degree Fully Hand Carved Bone Cow Pendant Necklace

$12.00

View Details
12 Pack Silver Plated 2.4mm Standard Ball Chain Necklace 30 Inch
12 Pack Silver Plated 2.4mm Standard Ball Chain Necklace 30 Inch

$3.49

View Details
16” Gold Plated Green Butterfly Necklace
16” Gold Plated Green Butterfly Necklace

$3.41

View Details
1pc Lock & Key Chain Rhinestone Key Charm Necklace for Women
1pc Lock & Key Chain Rhinestone Key Charm Necklace for Women

$6.32

View Details
Two Voices Heart Necklace, Barbie Nostalgia
Two Voices Heart Necklace, Barbie Nostalgia

$15.00

View Details
28"  STERLING SILVER 20MM  JINGLE BALL BELL (ANGEL CALLER) SILVER  28" NECKLACE
28" STERLING SILVER 20MM JINGLE BALL BELL (ANGEL CALLER) SILVER 28" NECKLACE

$16.95

View Details
Sylvester The Cat Pendant Necklace Looney Tunes. 2in Pendant
Sylvester The Cat Pendant Necklace Looney Tunes. 2in Pendant

$8.99

View Details
16” Grey Stone Star Chain Necklace
16” Grey Stone Star Chain Necklace

$3.90

View Details
Shamrock Lucky Charm Necklace Pendant Brass Metal Stamping Tiny Four Leaf Clover
Shamrock Lucky Charm Necklace Pendant Brass Metal Stamping Tiny Four Leaf Clover

$11.99

View Details
Sea Glass Starfish Pendant, Silver Snake Chain Necklace, 18 Inch, Green
Sea Glass Starfish Pendant, Silver Snake Chain Necklace, 18 Inch, Green

$7.19

View Details