Jardan

Vtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALED

Description: This is a vintage 1994 Virgin / MECHaDEUS PC video game set with big box that I found at a Seattle area estate sale. It is a 1994, CRITICAL PATH, Sci-Fi Adventure, Graphic Cover Big Box version PC game, action (see pictures). It is in unused condition, complete Factory Sealed, Cello Intact (see pictures). The graphic box is excellent (see pictures). This vintage Virgin Interactive Software personal computer video game comes as shown in the pictures. Should be of interest vintage PC computer video games-accessories-memorabilia & Virgin / Interplay Series PC video games related collectors. Take a look at the pictures & e-mail me with questions. Buyer pays $6.90 USA shipping. I will combine the shipping for multiple auction buyers.

Price: 24 USD

Location: Seattle, Washington

End Time: 2025-01-12T19:57:17.000Z

Shipping Cost: 6.9 USD

Product Images

Vtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALEDVtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALEDVtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALEDVtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALEDVtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALEDVtg 1994 Video PC Game CRITICAL PATH by Virgin Big Box FACTORY SEALED

Item Specifics

All returns accepted: ReturnsNotAccepted

Platform: PC / Windows CD ROM

Release Year: 1994

Rating: T-Teen

Features: Big Box

Genre: Action & Adventure

Publisher: Virgin / Mechadeus

Game Name: Critical Path

Recommended

Vtg 1994 Holson Disney Mini Mouse Hand Painted Mini Picture Photo Frame 3”x2.5”
Vtg 1994 Holson Disney Mini Mouse Hand Painted Mini Picture Photo Frame 3”x2.5”

$14.99

View Details
Vintage The Doors A Little Game 1994 Black Short Sleeve T-Shirt XL Jim Morrison
Vintage The Doors A Little Game 1994 Black Short Sleeve T-Shirt XL Jim Morrison

$149.00

View Details
Adriano Celentano 1994 Vintage Live tour Tshirt
Adriano Celentano 1994 Vintage Live tour Tshirt

$125.00

View Details
Vintage 1994 Grateful Dead Golf Tour Tee Shirt L Washington DC
Vintage 1994 Grateful Dead Golf Tour Tee Shirt L Washington DC

$225.00

View Details
Vtg 1994 Bridgeport Clemson Tigers Satin Button Up Men’s Size XL Jacket USA
Vtg 1994 Bridgeport Clemson Tigers Satin Button Up Men’s Size XL Jacket USA

$65.00

View Details
Vintage Godzilla 1994 King of Monster Vtg Movietee T Shirt, Size S-2XL
Vintage Godzilla 1994 King of Monster Vtg Movietee T Shirt, Size S-2XL

$29.99

View Details
Vintage Godzilla 1994 King of Monster Vtg Movietee T Shirt, Size S-5XL
Vintage Godzilla 1994 King of Monster Vtg Movietee T Shirt, Size S-5XL

$23.10

View Details
1994 Boilermaker Marathon 15k Running Race Utica NY Soffe Shirt Spectator XL VTG
1994 Boilermaker Marathon 15k Running Race Utica NY Soffe Shirt Spectator XL VTG

$26.99

View Details
VTG 1994 Dept 56 Dickens Heritage Village Dedlock Arms Porcelain Ornament BB21
VTG 1994 Dept 56 Dickens Heritage Village Dedlock Arms Porcelain Ornament BB21

$12.00

View Details
VTG  1994 Playmates Toys Primal Rage Action Figure Sauron Dinosaur 1994 No Tail
VTG 1994 Playmates Toys Primal Rage Action Figure Sauron Dinosaur 1994 No Tail

$12.00

View Details